| Saturday |
| |
 | | |  | | |  |
| No 2 arrives at NG | | ... and again | | No 3 arrives at Abergynolwyn |
| |
|
 | | |  | | |  |
| ... and again | | No 1 in Quarry Sidings Siding | | No 1 at the front of the train and No 2 at the back of the train |
| |
| Sunday |
| |
 | | |  | | |  |
| Peter Mason on No 1 at Quarry Sidings | | No 2 sits at Dolgoch | | Bill on No2 at Dolgoch |
| |
|
 | | |  | | |  |
| No 1 departs to Abergynolwyn with its train, while No 2 runs around | | No 2 and No 3 at Quarry Sidings | | No 3 and No 2 with their train standing by the old water column at Dolgoch |
| |
|
 | | |  | | |  |
| ... and again | | ... and again | | No 2 banks No 3 between by Mile Post 5 |
| |
|
 | | |  | | |  |
| No 2 at Quarry Sidings | | No 2 sits in the siding | | ... and again |
| |
|
 | | |  | | |  |
| ... and again | | ... and again. Bit of a long layover! | | ... and again |
| |
|
 | | |  | | |  |
| ... and again | | Bill on No 2 | | Loco Crew pose on No 2 - Andy, Andrew and Bill |
| |
|
 | | |  | | |  |
| Si Jenkins pulls into the loop on No 7 | | ... and again | | Keith drives past on No 6 |
| |
|
 | | |  | | |  |
| Andrew fills No 2 from the old water column at Dolgoch | | ... and again | | Gareth looking where he is going. No 3 double head with No 2 above Quarry Sidings |
| |
|
 | | |  | | |  |
| Comments to follow | | Comments to follow | | Comments to follow |
| |
|
 | | |  | | |  |
| Comments to follow | | Comments to follow | | Comments to follow |
| |
|
 | | |  | | |  |
| Comments to follow | | Comments to follow | | Comments to follow |
| |
|
 | | |  | | |  |
| Comments to follow | | Comments to follow | | Comments to follow |
| |
|
 | | |  | | |  |
| Comments to follow | | Comments to follow | | Comments to follow |
| |
|
 | | |  | | |  |
| Comments to follow | | Comments to follow | | Comments to follow |